120 MW DELIVERED · 14 MW LIVE IN AR · OCT 2026 ENERGIZATION

Power. Land. Closed.

Tarleton Energy sources, secures, and structures development-stage data center and mining sites. Power locked. Land controlled. SPV ready to transfer.

Scroll
0
MW
Delivered to investors
0
states
Active development footprint
0
MW
Ready now (AR) · 44 MW expandable
0
days
Typical close cycle
01 —What We Do

We package the hardest part of building a data center.

Originating a power-ready site is the bottleneck for every hyperscaler, miner, and HPC operator. We carry sites from raw opportunity to clean, transferable equity — so you can deploy capital, not chase utilities.

01

Source

We scout regions with stranded capacity, generous tariffs, and developable land. Direct relationships with utility planners get us to the site before anyone else.

02

Lock Power

Executed utility agreements, deposits funded, interconnect studies cleared. When you take title, you take energized capacity —not paperwork.

03

Control Land

Recorded purchase or option agreements, zoning verified, environmental and title clean. Surveyed, gradable, and ready to build day one.

04

Deliver SPV

Each site is held in a Delaware special-purpose entity. You acquire 100% of the equity. Clean cap table, signed contracts, transferable.

02 — Track Record

120 MW delivered. Five states.

WA OR CA NV ID MT WY UT AZ NM CO ND SD NE KS TX OK MN IA MO AR LA WI IL MS MI IN OH KY TN AL GA FL SC NC VA WV PA NY ME
Live site
Delivered to investors
Pipeline
Arkansas substation
DELIVERED

60 MW · Arkansas

Running

DELIVERED

60 MW · North Dakota

Running

AVAILABLE NOW
03 —Current Opportunity

Project 14MW / Northeast Arkansas

14 MW shovel-ready, expandable to 44 MW on the existing transmission feed. Held in a Delaware SPE. Energization tracking October 2026.

  • Capacity 14 MW · 161 kV on-site
  • Expansion Up to 44 MW on existing transmission
  • Power cost 3.9–4.4 ¢/kWh blended
  • Structure 100% SPV equity sale (Delaware)
  • Close 30 days
  • Status Power contract executed · Land lease executed
Project 14MW · Northeast Arkansas site
NEXORATECH LLC SPE · DELAWARE
Energization
Oct 2026
Structure
SPV Equity
04 —Pipeline

Next sites coming online.

Sites moving toward signed power within ~60 days. Available to qualified buyers under NDA.

Tennessee 15MW pipeline site
CONTRACT < 60 DAYS TENNESSEE

TN 15MW Site

  • Capacity15 MW single-phase
  • Power cost~3.3 ¢/kWh all-in
  • Structure100% SPV equity sale
Ohio and Texas 20MW+ pipeline sites
EARLY STAGE OHIO · TEXAS

OH / TX 20 MW+ Sites

  • Capacity20 MW+ per site
  • StagePower discussions underway
  • Structure100% SPV equity sale
05 —How a Deal Closes

From first call to wire —30 days.

Principal-led, no broker chain. Every step is signed off by the same person who originated the site.

  1. Day 0

    NDA & Data Room

    Mutual NDA executed within 24 hours. Full data room —contracts, surveys, environmental, utility correspondence —released same day.

  2. Day 3—

    Site Visit & Technical Diligence

    On-site walk, utility introduction, Q&A with engineering counterparties. We host, we don't gatekeep.

  3. Day 10

    LOI & Exclusivity

    Signed letter of intent locks the deal. 21-day diligence period; clean exit if anything material breaks.

  4. Day 30

    Close —SPV Transfer

    100% equity assigned to buyer. You take energized capacity.

06 —Who We Are

A single-PM shop. Every site, principal-led.

Tarleton Energy originates and structures development-stage power sites for institutional buyers. We don't broker. We don't farm leads. Each project is carried by a principal from utility intro through closing wire —which is why our diligence rooms hold up and our timelines hold.

We work with serious counterparties: public miners, HPC and AI operators, infrastructure funds, and family offices building behind-the-meter capacity at scale.

Operating model
Principal · Direct · No broker chain
Jurisdiction
Delaware SPEs · US-only sites
Counterparties
Miners · HPC · AI · Infra funds
Baseload generation site

Power-ready sites are a sourcing problem, not a capital problem. We solve the sourcing.

07 —Get in Touch

Tell us what you're building.